ABHAVTECH SD-ACCESS PROJECT - EXECUTIVE SUMMARY

Cost Breakdown by Category

Category Item Mumbai Chennai Noida Global Total Quantity Unit Cost ($) Total Cost ($) Annual OpEx ($) Notes
Fabric Infrastructure
Border Nodes C9500-24Y4C 2 2 Integrated in FIAB 0 4 $X,XXX $X,XXX $X,XXX External connectivity + VRF routing
Control Plane Nodes C9500-24Y4C 2 2 Integrated in FIAB 0 4 $X,XXX $X,XXX $X,XXX LISP Map-Server/Map-Resolver
Intermediate Nodes C9500-24Y4C 2 2 0 0 4 $X,XXX $X,XXX $X,XXX Aggregation layer (only Mumbai/Chennai)
Edge Switches C9300-48U 48 54 4 0 106 $X,XXX $X,XXX $X,XXX Access layer for users
FIAB Core C9300-48UXM 0 0 2 0 2 $X,XXX $X,XXX $X,XXX Noida branch collapsed design
Access Switches C9200-48P 0 0 4 0 4 $X,XXX $X,XXX $X,XXX Noida traditional access
Wireless Infrastructure
Wireless LAN Controllers C9800-40 2 2 0 0 4 $X,XXX $X,XXX $X,XXX Centralized wireless management
Embedded WLC EWC License 0 0 2 0 2 $X,XXX $X,XXX $X,XXX Included in C9300-48UXM DNA license
Indoor Access Points C9130AXI 342 170 20 0 532 $X,XXX $X,XXX $X,XXX Wi-Fi 6E enterprise APs
Outdoor Access Points C9164I-E 58 30 0 0 88 $X,XXX $X,XXX $X,XXX Outdoor hardened APs
Security Infrastructure
Firewalls FTD 4150 3 0 0 0 3 $X,XXX $X,XXX $X,XXX Mumbai DIA (2) + MPLS (1)
Firewalls FTD 2130 0 2 0 0 2 $X,XXX $X,XXX $X,XXX Chennai HA pair
Firewalls FTD 1150 0 0 2 0 2 $X,XXX $X,XXX $X,XXX Noida branch HA pair
Firewall Management FMC Virtual 1 1 0 0 2 $X,XXX $X,XXX $X,XXX Centralized firewall management
ISE Primary PAN SNS-3695 1 0 0 0 1 $X,XXX $X,XXX $X,XXX Policy Admin Node (Mumbai)
ISE Secondary PAN SNS-3695 0 1 0 0 1 $X,XXX $X,XXX $X,XXX Secondary PAN (Chennai)
ISE PSN Nodes SNS-3655 2 2 0 0 4 $X,XXX $X,XXX $X,XXX Policy Service Nodes (RADIUS)
ISE MnT Nodes SNS-3655 1 1 0 0 2 $X,XXX $X,XXX $X,XXX Monitoring & Logging
DDI Infrastructure
DNS/DHCP/IPAM Infoblox IB-1420 2 2 0 0 4 $X,XXX $X,XXX $X,XXX Integrated DDI appliances
NTP Servers Meinberg M1000 2 0 0 0 2 $X,XXX $X,XXX $X,XXX GPS-disciplined Stratum 2
NTP Servers Meinberg M300 0 1 0 0 1 $X,XXX $X,XXX $X,XXX Chennai Stratum 3
Management & Orchestration
DNAC Cluster Primary DN2-HW-APL-XL 0 0 0 3 3 $X,XXX $X,XXX $X,XXX New Jersey primary cluster
DNAC Cluster DR DN2-HW-APL-XL 0 0 0 3 3 $X,XXX $X,XXX $X,XXX London DR cluster
Monitoring & Backup
Syslog Server Linux VM 1 1 0 0 2 $X,XXX $X,XXX $X,XXX Centralized logging
NetFlow Collector Cisco Stealthwatch 1 0 0 0 1 $X,XXX $X,XXX $X,XXX Traffic analytics
SNMP Monitoring PRTG Network Monitor 1 0 0 0 1 $X,XXX $X,XXX $X,XXX Device health monitoring
Backup Appliance NetBackup 1 0 0 0 1 $X,XXX $X,XXX $X,XXX DNAC/ISE backup target
RANCID Config Backup Open Source 1 0 0 0 1 $X,XXX $X,XXX $X,XXX Redundant config backup
ISE Backup SFTP Linux VM 1 0 0 0 1 $X,XXX $X,XXX $X,XXX ISE backup repository
Load Balancing
ISE PSN Load Balancer F5 BIG-IP VE 1 1 0 0 2 $X,XXX $X,XXX $X,XXX RADIUS load balancing
Automation
Ansible Tower Software License 0 0 0 1 1 $X,XXX $X,XXX $X,XXX Network automation platform
Licensing
DNA Advantage (3-year) Per Device 638 0 0 0 638 $X,XXX $X,XXX $X,XXX SD-Access + Assurance features
ISE Plus (3-year) Per Endpoint 18000 0 0 0 18000 $X,XXX $X,XXX $X,XXX TrustSec + Profiling + Posture
Firewall Subscriptions Per Appliance 3 2 2 0 7 $X,XXX $X,XXX $X,XXX IPS + URL + Malware (annual)
Professional Services
Design & Planning 1 $X,XXX $X,XXX $X,XXX Architecture design (2 weeks)
Implementation Mumbai 1 $X,XXX $X,XXX $X,XXX Deployment + integration (6 weeks)
Implementation Chennai 1 $X,XXX $X,XXX $X,XXX Deployment (4 weeks)
Implementation Noida 1 $X,XXX $X,XXX $X,XXX Branch deployment (1 week)
Training Admin Training 1 $X,XXX $X,XXX $X,XXX DNAC + ISE training (1 week)
Support Contract TAC 24x7 1 $X,XXX $X,XXX $X,XXX Cisco TAC support (annual)
Contingency
Contingency 10% Buffer 1 $X,XXX $X,XXX $X,XXX Unforeseen costs & changes
Totals
Total Infrastructure CapEx $X,XXX Hardware + appliances
Total Licensing (3-year) $X,XXX Amortized over $X,XXX years
Total Services (One-time) $X,XXX Design + implementation + training
Total Contingency $X,XXX $X,XXX% buffer
GRAND TOTAL CapEx $X,XXX One-time investment
GRAND TOTAL Annual OpEx $X,XXX Recurring per year
3-Year TCO $X,XXX Total Cost of Ownership

Project Timeline

Phase Activity Duration (Weeks) Start End Dependencies Milestones Resources Required Risk Level
Phase 0 Design & Planning 4 Week 1 Week 4 None Design approval + BoM finalized 2 architects + 1 PM Low
Phase 1 Hardware Procurement 8 Week 5 Week 12 Phase 0 complete All equipment received Procurement team Medium (supply chain)
Phase 2 DNAC Deployment 3 Week 13 Week 15 Hardware received DNAC cluster operational 2 engineers Low
Phase 3 ISE Deployment 3 Week 16 Week 18 DNAC ready ISE PAN + PSN operational 2 engineers Medium
Phase 4 Mumbai Fabric Build 6 Week 19 Week 24 ISE ready Mumbai fabric live 4 engineers High
Phase 5 Chennai Fabric Build 4 Week 25 Week 28 Mumbai complete Chennai fabric live 3 engineers Medium
Phase 6 Noida Branch Deployment 2 Week 29 Week 30 Chennai complete Noida FIAB live 2 engineers Low
Phase 7 Firewall Integration 2 Week 31 Week 32 All sites live Security policies active 2 security engineers Medium
Phase 8 Monitoring & Automation 2 Week 33 Week 34 Firewall done Full visibility achieved 2 engineers Low
Phase 9 User Acceptance Testing 2 Week 35 Week 36 All systems integrated UAT sign-off 4 engineers + users Medium
Phase 10 Training & Handover 2 Week 37 Week 38 UAT complete Project closure 2 trainers Low
Total Project Duration 38 weeks Week 1 Week 38 Go-live: Week 36 10-15 engineers peak

Risk Assessment

Risk ID Risk Description Probability Impact Mitigation Strategy Owner Status
R001 Hardware delivery delays Medium High Order 4 weeks early + backup vendors Procurement Open
R002 DNAC cluster sizing insufficient Low Critical Validate with Cisco TAC pre-purchase Architect Closed
R003 ISE integration issues Medium High Engage Cisco PSS for ISE deployment Project Manager Open
R004 Fabric underlay misconfiguration High Critical Deploy test lab first + peer review configs Lead Engineer Open
R005 WAN latency to DNAC (APAC) Medium Medium Implement regional DNAC in Year 2 if needed Architect Accepted
R006 Firewall throughput bottleneck Low High Size FTD 4150 with 2.5× headroom Security Engineer Closed
R007 Budget overrun Medium High 10% contingency buffer + monthly tracking PM + Finance Open
R008 Skill gap (SD-Access expertise) High Medium External consultants + Cisco training HR + PM Mitigated
R009 Change management resistance Medium Medium User training + phased rollout Change Manager Open
R010 Vendor lock-in (Cisco) Low Medium Document open APIs + automation via Ansible Architect Accepted

Resource Requirements

Role Quantity Duration (Weeks) Hourly Rate ($) Total Cost ($) Responsibility Required Skills Notes
Network Architect 2 38 $X,XXX $X,XXX Overall design + validation CCIE/CCDE + SD-Access Lead technical decisions
Project Manager 1 38 $X,XXX $X,XXX Timeline + budget + risk PMP + IT experience Single point of contact
Network Engineer 4 30 $X,XXX $X,XXX Implementation + config CCNP + SD-Access training Hands-on deployment
Security Engineer 2 10 $X,XXX $X,XXX Firewall + ISE policies CCNP Security Firewall + TrustSec focus
Wireless Engineer 2 8 $X,XXX $X,XXX WLC + AP deployment CCNP Wireless Wi-Fi 6E expertise
QA/Test Engineer 2 6 $X,XXX $X,XXX UAT + validation CCNA + test scripts Pre-production testing
Trainer 1 2 $X,XXX $X,XXX Admin training CCNA + teaching exp Knowledge transfer
Total Professional Services $X,XXX External consultants if needed

Capacity Headroom Analysis

Component Current Load Platform Capacity Utilization % 3-Year Projected 3-Year Utilization % Headroom Remaining Upgrade Trigger Notes
DNAC Devices 638 8000 8% 1500 19% 81% >60% utilization Well-sized for growth
ISE Endpoints 18000 25000 72% 30000 120% OVER CAPACITY Upgrade to 50K license at Year 2 Action required
Border Throughput 28 Gbps 440 Gbps 6.4% 45 Gbps 10.2% 89.8% >50% utilization Excellent headroom
WLC APs 532 2000 27% 750 38% 62% >70% utilization Good capacity
Firewall (Mumbai) 18 Gbps 70 Gbps 26% 28 Gbps 40% 60% >60% utilization Well-sized
Edge Ports 5400 6912 78% 6500 94% 6% Add edge stacks at Year 1 Monitor growth closely

Key Design Decisions

Decision Options Considered Selected Option Rationale Trade-offs Approval Date Approver
Centralized vs Distributed DNAC Centralized (NJ) vs Regional (3 sites) Centralized Cost savings ($X,XXX over 5 years) + adequate for stable ops 200ms latency to APAC tolerable 2026-01-15 CTO
Collapse Border+CP? Separate vs Collapsed Keep Separate Security + scalability + standard design Cost $X,XXX more per site 2026-01-18 Network Architect
Intermediate Nodes Needed? Yes vs No YES (Mumbai/Chennai) 48 edges > CP port capacity Add $X,XXX cost 2026-01-20 Network Architect
Firewall Platform FTD vs ASA vs Palo Alto Cisco FTD SD-Access SGT integration + Cisco ecosystem Vendor lock-in 2026-01-22 Security Architect
WLC Placement Centralized vs Embedded Centralized (hubs) + EWC (branches) Performance + features vs cost optimization Hubs get full features 2026-01-25 Wireless Architect
ISE PSN Load Balancer? F5 vs HAProxy vs ISE Node Groups F5 BIG-IP VE Enterprise support + proven Cost $X,XXX 2026-01-28 Security Architect
QoS Strategy Trust DSCP vs Re-mark All Trust DSCP from endpoints Simpler + faster Requires endpoint compliance 2026-01-30 Network Architect