5.15 High Availability Failover Procedures
| Item |
Details |
| Organization |
Abhavtech.com |
| Version |
2.0 |
| Last Updated |
December 2025 |
1. HA Architecture Overview
1.1 Abhavtech HA Design
┌─────────────────────────────────────────────────────────────────────┐
│ Abhavtech HA Architecture │
├─────────────────────────────────────────────────────────────────────┤
│ │
│ CATALYST CENTER ISE │
│ ┌─────────────────────┐ ┌─────────────────────┐ │
│ │ Primary Cluster │ │ PAN/MnT Pair │ │
│ │ (New Jersey - 3 nodes)│ │ Primary: NJ │ │
│ │ RTO: 4 hours │ │ Secondary: London │ │
│ │ RPO: 4 hours │ │ RTO: 30 seconds │ │
│ └──────────┬──────────┘ └──────────┬──────────┘ │
│ │ │ │
│ │ Warm Standby │ Auto Sync │
│ │ │ │
│ ┌──────────▼──────────┐ ┌──────────▼──────────┐ │
│ │ DR Cluster │ │ PSN Pairs (per region)│ │
│ │ (London - 3 nodes) │ │ Active-Active LB │ │
│ └─────────────────────┘ │ RTO: 30 seconds │ │
│ └─────────────────────┘ │
│ │
│ WIRELESS INFOBLOX │
│ ┌─────────────────────┐ ┌─────────────────────┐ │
│ │ WLC HA SSO Pairs │ │ Grid Master HA │ │
│ │ Active + Standby │ │ Primary: NJ │ │
│ │ RTO: <60 seconds │ │ Secondary: London │ │
│ └─────────────────────┘ └─────────────────────┘ │
│ │
└─────────────────────────────────────────────────────────────────────┘
1.2 RTO/RPO Summary
| Component |
RTO |
RPO |
Failover Type |
Trigger |
| Catalyst Center |
4 hours |
4 hours |
Manual |
Complete cluster failure |
| ISE PAN |
30 seconds |
0 (sync) |
Automatic |
Node failure |
| ISE PSN |
30 seconds |
0 |
Automatic |
Node failure |
| WLC (SSO) |
<60 seconds |
0 |
Automatic |
Active failure |
| Infoblox Grid |
5 minutes |
0 (sync) |
Automatic |
Master failure |
2. Catalyst Center Failover Procedures
2.1 Planned Failover (Maintenance)
Catalyst_Center_Planned_Failover:
Pre_Failover_Checklist:
- [ ] Verify DR cluster (London) is healthy
- [ ] Confirm latest backup completed
- [ ] Notify stakeholders (2 hours advance)
- [ ] Open change ticket
- [ ] Have rollback plan ready
Step_1_Verify_DR_Readiness:
Command: Access DR cluster UI
URL: https://catalyst-dr.abhavtech.com
Check:
- All 3 nodes showing healthy
- Database replication current (check timestamp)
- Certificates valid
Duration: 10 minutes
Step_2_Stop_Primary_Services:
Action: Graceful shutdown of primary
Access: SSH to primary cluster leader
Command: |
maglev cluster stop
Verify: All services stopped
Duration: 15-20 minutes
Step_3_Activate_DR_Cluster:
Action: Promote DR to primary
Access: SSH to DR cluster leader
Command: |
maglev cluster promote
Duration: 30-45 minutes
Step_4_Update_DNS:
Action: Point catalyst.abhavtech.com to DR IP
Infoblox: Change A record from NJ to London IP
Old: 10.105.10.10 (NJ)
New: 10.103.10.10 (London)
TTL: Set to 60 seconds before failover
Duration: 5 minutes + TTL propagation
Step_5_Verify_Operations:
Check:
- [ ] UI accessible via DNS name
- [ ] All 9 fabric sites visible
- [ ] Device inventory correct
- [ ] Assurance data flowing
Duration: 15 minutes
Step_6_Communicate:
- Update ticket with success
- Notify stakeholders
- Monitor for 1 hour
2.2 Unplanned Failover (Emergency DR)
Catalyst_Center_Emergency_DR:
Trigger_Conditions:
- Primary cluster unresponsive > 30 minutes
- Data center outage confirmed
- All 3 nodes failed
Immediate_Actions (0-15 minutes):
- [ ] Confirm primary truly down (not network issue)
- [ ] Page on-call infrastructure lead
- [ ] Open P1 incident ticket
- [ ] Notify management (email)
Failover_Execution (15-60 minutes):
Step_1: Access DR cluster directly
URL: https://10.103.10.10 (London IP)
Check: DR cluster healthy
Step_2: Promote DR cluster
SSH: ssh admin@catalyst-dr.abhavtech.com
Command: maglev cluster promote --force
Note: --force skips primary check
Step_3: Update DNS immediately
Infoblox: catalyst.abhavtech.com → 10.103.10.10
Step_4: Verify critical functions
- [ ] Fabric sites reachable
- [ ] Can provision changes
- [ ] Assurance collecting data
Post_Failover (60+ minutes):
- Full functionality test
- Document data loss (if any)
- Plan primary recovery
- Post-incident review
2.3 Catalyst Center Failback Procedure
Catalyst_Center_Failback:
Prerequisites:
- Primary cluster restored and healthy
- Change window approved
- Full backup of DR cluster taken
Step_1_Sync_Primary:
Action: Restore primary from DR backup
Duration: 2-4 hours depending on data size
Step_2_Verify_Primary:
Check:
- All nodes healthy
- Database synchronized
- Certificates valid
Step_3_Planned_Failover:
Follow "Planned Failover" procedure in reverse
Step_4_Demote_DR:
SSH: ssh admin@catalyst-dr.abhavtech.com
Command: maglev cluster demote
Duration: 30 minutes
Step_5_Restore_Replication:
Re-establish primary → DR replication
Verify sync is current
3. ISE Failover Procedures
3.1 ISE PAN Failover (Automatic)
ISE_PAN_Automatic_Failover:
Design:
Primary PAN: nj-ise-pan.abhavtech.com (10.250.10.20)
Secondary PAN: lon-ise-pan.abhavtech.com (10.253.10.20)
Sync: Real-time database replication
Automatic_Trigger:
- Primary PAN heartbeat lost > 10 minutes
- Primary PAN manually demoted
What_Happens_Automatically:
1. Secondary detects primary failure
2. Secondary promotes itself to Primary
3. All PSNs re-register to new Primary
4. Admin portal available on new Primary
Duration: 5-10 minutes
Manual_Verification:
Path: ISE → Administration → System → Deployment
Confirm:
- New Primary shows as Primary PAN
- Old Primary shows as Secondary (when recovered)
- All PSNs connected
3.2 ISE PSN Failover
ISE_PSN_Failover:
Design_Per_Region:
APAC:
Primary PSN: mum-ise-psn-01 (10.250.10.21)
Secondary PSN: mum-ise-psn-02 (10.250.10.22)
Load Balancer: F5 VIP 10.250.10.25
Automatic_Failover:
Trigger: F5 health check fails (RADIUS port 1812)
Action: F5 removes failed PSN from pool
RTO: < 30 seconds
Manual_Failover_Steps:
Step_1: Disable PSN in ISE
Path: Administration → System → Deployment
Select PSN → Disable
Step_2: Remove from F5 pool
F5: Local Traffic → Pools → ISE-PSN-Pool
Member Status: Forced Offline
Step_3: Verify authentication
Test: test aaa group RADIUS-SERVERS user pass
Check ISE Live Logs
Failback:
1. Enable PSN in ISE
2. Verify services running
3. Add back to F5 pool
4. Monitor load distribution
3.3 ISE Complete Site Failure
ISE_Site_Failure_Mumbai:
Scenario: Both Mumbai PSNs unavailable
Immediate_Impact:
- Mumbai users cannot authenticate
- New connections fail
- Existing sessions continue (until re-auth)
Failover_To_Chennai:
Step_1: Update NAD RADIUS configuration
Option A: DNS-based (if using DNS for RADIUS)
- Update ise-psn.abhavtech.com to Chennai IPs
Option B: Manual NAD update (if using IP)
- Push new RADIUS config via Catalyst Center
Step_2: Push RADIUS change to Mumbai switches
Catalyst Center → Provision → Network Devices
Select Mumbai devices → Push Configuration
Step_3: Verify authentication
- Test user login
- Check ISE Live Logs on Chennai PSNs
Latency_Consideration:
Mumbai → Chennai: ~20ms additional latency
Impact: Authentication may take 100-200ms longer
Acceptable for emergency situation
4. WLC HA SSO Failover
4.1 Automatic SSO Failover
WLC_SSO_Failover:
Design:
Mumbai WLC Pair:
Active: mum-wlc-01 (10.100.10.40)
Standby: mum-wlc-02 (10.100.10.41)
Redundancy IP: 10.100.10.42
Automatic_Failover:
Trigger:
- Active WLC failure
- Keepalive timeout (3 missed = 9 seconds)
Action:
- Standby becomes Active
- APs maintain association
- Clients experience <1 second disruption
Duration: 30-60 seconds
Verification_Commands:
show redundancy summary
show ap summary
show client summary
Expected_Output:
Redundancy Mode: SSO
Local State: ACTIVE
Peer State: STANDBY HOT
Manual_Switchover (Maintenance):
Command: redundancy force-switchover
Use: Planned maintenance on active WLC
4.2 WLC Failback
WLC_Failback:
After_Original_Active_Recovered:
1. Original Active boots as Standby
2. Synchronizes config from new Active
3. Becomes "Standby Hot"
Manual_Failback (if desired):
Command: redundancy force-switchover
Note: Only if original Active preferred
Impact: Brief client disruption
Recommendation:
- Let system run with new Active
- Failback during next maintenance window
- Reduces unnecessary disruptions
5. Failover Testing Procedures
5.1 Quarterly Failover Test Plan
Quarterly_Failover_Test:
Schedule: Second Saturday of Q2, Q4 (June, December)
Duration: 4 hours (8 AM - 12 PM)
Owner: Infrastructure Lead
Test_1_ISE_PSN_Failover (30 min):
- Disable one PSN per region
- Verify authentication continues
- Re-enable PSN
- Verify load balancing
Success: Auth success rate > 99%
Test_2_WLC_SSO_Failover (30 min):
- Force switchover on one WLC pair
- Verify AP associations maintained
- Verify client connectivity
- Switchover back
Success: No client disconnect > 2 seconds
Test_3_ISE_PAN_Failover (60 min):
- Coordinate with ISE admin
- Stop Primary PAN services
- Verify Secondary promotes
- Verify admin access
- Restore Primary PAN
Success: Secondary promotion < 15 minutes
Test_4_Catalyst_Center_DR (90 min):
- Use read-only DR verification
- Do NOT promote DR (unless full DR test)
- Verify DR data is current
- Test DR cluster health
Success: DR data < 4 hours old
Documentation:
- Record all test results
- Document any issues
- Update runbooks if needed
- Report to management
5.2 Failover Test Results Template
╔══════════════════════════════════════════════════════════════════╗
║ FAILOVER TEST RESULTS - [DATE] ║
╠══════════════════════════════════════════════════════════════════╣
║ Test: ISE PSN Failover ║
║ Start Time: ________ End Time: ________ ║
║ Tester: __________________ ║
╠══════════════════════════════════════════════════════════════════╣
║ Pre-Test State: ║
║ • Active PSN: _________________ Status: UP ║
║ • Standby PSN: ________________ Status: UP ║
║ • Auth Rate Before: _________ auths/min ║
╠══════════════════════════════════════════════════════════════════╣
║ Test Execution: ║
║ • PSN Disabled: ________________ Time: ________ ║
║ • Failover Detected: Time: ________ ║
║ • Auth Continued: YES / NO ║
║ • Failover Duration: ________ seconds ║
╠══════════════════════════════════════════════════════════════════╣
║ Post-Test Verification: ║
║ • PSN Re-enabled: Time: ________ ║
║ • Load Balanced: YES / NO ║
║ • Auth Rate After: _________ auths/min ║
╠══════════════════════════════════════════════════════════════════╣
║ RESULT: PASS / FAIL ║
║ Issues Found: ________________________________________________ ║
║ Remediation: _________________________________________________ ║
╚══════════════════════════════════════════════════════════════════╝
| Role |
Name |
Phone |
Escalation Time |
| NOC On-Call |
Rotation |
+91-xxx-xxx-xxxx |
Immediate |
| Infrastructure Lead |
[Name] |
+91-xxx-xxx-xxxx |
15 minutes |
| Network Architect |
[Name] |
+91-xxx-xxx-xxxx |
30 minutes |
| Cisco TAC |
- |
1-800-553-2447 |
As needed |
Document Version: 2.0