Chapter 6: Migration Strategy & Financial Analysis
About the financial figures
All monetary values in this chapter are shown as indicative placeholders ($X,XXX) for illustrative modelling purposes only. They do not represent vendor pricing, quotes, or actual costs. The methodology, cost categories, and analytical structure are the focus; substitute your own validated pricing before using any figure for budgeting or procurement.
Quick Navigation
6.1 Migration Strategy
6.1.1 Migration Approach Selection
| Approach |
Description |
Risk |
Duration |
Selected |
| Big Bang |
All sites simultaneously |
High |
4 weeks |
|
| Phased by Region |
Region at a time |
Medium |
32 weeks |
|
| Phased by Site |
Site at a time |
Low |
52 weeks |
|
| Phased Hybrid |
Hub sites first, branches parallel |
Medium-Low |
40 weeks |
SELECTED |
Rationale for Phased Hybrid Approach:
- Hub sites migrated sequentially (risk management)
- Branch sites migrated in parallel within regions (efficiency)
- Lessons learned from pilot applied to subsequent sites
- Resources optimized across teams
6.1.2 Migration Phases
+------------------------------------------------------------------+
| MIGRATION TIMELINE (40 WEEKS) |
+------------------------------------------------------------------+
Phase 1: Foundation (Weeks 1-6)
+----------------------------------------------------------------+
| Week 1-2 | Week 3-4 | Week 5-6 |
| DNAC | ISE | Integration |
| Install | Deploy | DNAC-ISE, Underlay Prep |
+----------------------------------------------------------------+
Phase 2: Pilot (Weeks 7-10)
+----------------------------------------------------------------+
| Week 7-8 | Week 9-10 |
| Mumbai Pilot | Validation & Refinement |
| (1 Building) | Lessons Learned |
+----------------------------------------------------------------+
Phase 3: Hub Sites (Weeks 11-22)
+----------------------------------------------------------------+
| Week 11-12 | Week 13-14 | Week 15-16 | Week 17-18 | Week 19-22 |
| Mumbai | Chennai | London | Frankfurt | NJ + Dallas|
| Full | Full | Full | Full | Full |
+----------------------------------------------------------------+
Phase 4: Branch Sites (Weeks 23-34)
+----------------------------------------------------------------+
| Week 23-26 | Week 27-30 | Week 31-34 |
| APAC Branches | EMEA Branches | Americas Branches |
| (5 sites) | (12 sites) | (15 sites) |
+----------------------------------------------------------------+
Phase 5: Optimization (Weeks 35-40)
+----------------------------------------------------------------+
| Week 35-36 | Week 37-38 | Week 39-40 |
| Performance | Training & | Documentation & |
| Tuning | Knowledge | Handover |
| | Transfer | |
+----------------------------------------------------------------+
6.1.3 Site Migration Sequence
| Order |
Site |
Type |
Devices |
Endpoints |
Duration |
Dependencies |
| 1 |
Mumbai (Pilot) |
Hub |
10 |
500 |
2 weeks |
DNAC/ISE ready |
| 2 |
Mumbai (Full) |
Hub |
52 |
4,200 |
2 weeks |
Pilot success |
| 3 |
Chennai |
Hub |
40 |
3,100 |
2 weeks |
Mumbai complete |
| 4 |
London |
Hub |
46 |
3,500 |
2 weeks |
Chennai complete |
| 5 |
Frankfurt |
Hub |
32 |
2,400 |
2 weeks |
London complete |
| 6 |
New Jersey |
Hub |
56 |
4,500 |
2 weeks |
Frankfurt complete |
| 7 |
Dallas |
Hub |
36 |
2,800 |
2 weeks |
NJ complete |
| 8-12 |
APAC Branches |
Branch |
5 each |
200-400 |
4 weeks |
Hub complete |
| 13-24 |
EMEA Branches |
Branch |
4 each |
150-300 |
4 weeks |
Hub complete |
| 25-39 |
Americas Branches |
Branch |
4 each |
150-300 |
4 weeks |
Hub complete |
6.1.4 Migration Dependencies
+------------------------------------------------------------------+
| DEPENDENCY MATRIX |
+------------------------------------------------------------------+
DNAC Installation
|
+--> ISE Deployment
| |
| +--> DNAC-ISE Integration
| |
| +--> Policy Definition
| |
+--> Underlay Provisioning |
| |
+--> Fabric Site Creation <--+
|
+--> Node Provisioning
|
+--> Host Onboarding
|
+--> User Migration
|
+--> Legacy Decommission
6.1.5 Resource Requirements
| Phase |
Network Engineers |
Security Engineers |
Project Manager |
Vendor Support |
| Phase 1 |
4 |
2 |
1 |
2 (Cisco) |
| Phase 2 |
4 |
2 |
1 |
2 (Cisco) |
| Phase 3 |
6 |
3 |
1 |
2 (Cisco) |
| Phase 4 |
8 |
2 |
1 |
1 (Cisco) |
| Phase 5 |
4 |
2 |
1 |
0 |
6.2 Legacy Decommissioning
6.2.1 Hardware Retirement Schedule
| Category |
Model |
Quantity |
Retirement Phase |
Disposal |
| Core Switches |
Catalyst 6500 |
8 |
Phase 3 |
E-waste vendor |
| Core Switches |
Catalyst 6800 |
10 |
Phase 3 |
E-waste vendor |
| Distribution |
Catalyst 4500 |
24 |
Phase 3-4 |
E-waste vendor |
| Access Switches |
Catalyst 3750 |
120 |
Phase 3-4 |
Resale/E-waste |
| Access Switches |
Catalyst 3850 |
60 |
Phase 4 |
Resale/E-waste |
| Wireless Controllers |
WLC 5520 |
6 |
Phase 3-4 |
E-waste vendor |
| Wireless Controllers |
WLC 8540 |
6 |
Phase 3-4 |
E-waste vendor |
| Access Points |
Various legacy |
400 |
Phase 3-4 |
E-waste vendor |
| Firewalls |
ASA 5500-X |
18 |
Phase 5 |
Trade-in |
6.2.2 Legacy License Termination
| License Type |
Current Count |
Annual Cost |
Termination Date |
Savings |
| SmartNet (Cat 6500) |
18 |
$X,XXX |
End of Phase 3 |
$X,XXX/yr |
| SmartNet (Cat 3750) |
120 |
$X,XXX |
End of Phase 4 |
$X,XXX/yr |
| SmartNet (Cat 3850) |
60 |
$X,XXX |
End of Phase 4 |
$X,XXX/yr |
| WLC Support |
12 |
$X,XXX |
End of Phase 4 |
$X,XXX/yr |
| Prime Infrastructure |
1 |
$X,XXX |
End of Phase 5 |
$X,XXX/yr |
| Total Annual |
|
$X,XXX |
|
$X,XXX |
6.2.3 Data Migration Requirements
| Data Type |
Source |
Destination |
Migration Method |
| Device inventory |
Spreadsheet/Prime |
DNAC |
Auto-discovery |
| Network diagrams |
Visio |
DNAC hierarchy |
Manual creation |
| IP address allocation |
IPAM |
DNAC IP pools |
API import |
| VLAN database |
Switch configs |
VN mapping |
Manual mapping |
| ACLs |
Switch configs |
SGACLs |
Policy translation |
| User database |
AD/LDAP |
ISE (linked) |
AD integration |
| MAC addresses |
Switch tables |
ISE profiling |
Auto-profiling |
6.2.4 Parallel Operation Period
+------------------------------------------------------------------+
| PARALLEL OPERATION SCHEDULE |
+------------------------------------------------------------------+
Legacy | SD-Access
Operating | Operating
-----------------------||-----------------------
||
Phase 1-2 || Foundation + Pilot
Full Legacy || Limited SD-Access
Operation || (Pilot only)
||
-----------------------||-----------------------
||
Phase 3 || Hub Sites Migration
Legacy (non-migrated) || SD-Access (migrated)
Co-exists || Growing
||
-----------------------||-----------------------
||
Phase 4 || Branch Migration
Legacy (branches) || SD-Access (hubs)
Shrinking || Expanding
||
-----------------------||-----------------------
||
Phase 5 || Full SD-Access
Legacy || Complete
Decommissioned || Operations
||
+------------------------------------------------------------------+
6.3 License Mapping
6.3.1 Cisco DNA Licensing Model
+------------------------------------------------------------------+
| DNA LICENSE TIERS |
+------------------------------------------------------------------+
ESSENTIALS | ADVANTAGE | PREMIER
------------|-------------|------------
Automation ✓ | ✓ | ✓
Basic Monitoring ✓ | ✓ | ✓
Assurance - | ✓ | ✓
SD-Access - | ✓ | ✓
Group Policy - | ✓ | ✓
Security Analytics - | - | ✓
Stealthwatch - | - | ✓
Encrypted Traffic - | - | ✓
SELECTED: DNA ADVANTAGE (Required for SD-Access)
6.3.2 License Quantity Calculation
Switching Licenses
| Device Type |
Quantity |
License Term |
Unit Price |
Total |
| Catalyst 9500-48Y4C |
24 |
5-year DNA-A |
$X,XXX |
$X,XXX |
| Catalyst 9500-24Y4C |
12 |
5-year DNA-A |
$X,XXX |
$X,XXX |
| Catalyst 9300-48U |
238 |
5-year DNA-A |
$X,XXX |
$X,XXX |
| Catalyst 9300-24U |
48 |
5-year DNA-A |
$X,XXX |
$X,XXX |
| Catalyst 9200-48P |
120 |
5-year DNA-A |
$X,XXX |
$X,XXX |
| Subtotal Switching |
|
|
|
$X,XXX |
Wireless Licenses
| Device Type |
Quantity |
License Term |
Unit Price |
Total |
| Catalyst 9800-40 WLC |
6 |
Included |
- |
- |
| Catalyst 9800-80 WLC |
6 |
Included |
- |
- |
| C9130AXI AP |
350 |
5-year DNA-A |
$X,XXX |
$X,XXX |
| C9120AXI AP |
240 |
5-year DNA-A |
$X,XXX |
$X,XXX |
| Subtotal Wireless |
|
|
|
$X,XXX |
ISE Licenses
| License Type |
Endpoints |
Term |
Unit Price |
Total |
| ISE Base |
19,000 |
5-year |
$X,XXX/endpoint |
$X,XXX |
| ISE Plus |
19,000 |
5-year |
$X,XXX/endpoint |
$X,XXX |
| Subtotal ISE |
|
|
|
$X,XXX |
Total Licensing (5-Year): $X,XXX
6.3.3 Legacy to DNA License Mapping
| Legacy License |
Annual Cost |
DNA Equivalent |
5-Year Cost |
Savings |
| LAN Base |
$X,XXX |
DNA Advantage |
Included |
$X,XXX |
| Prime Infrastructure |
$X,XXX |
DNAC (appliance) |
Included |
$X,XXX |
| WLC License |
$X,XXX |
DNA Wireless |
Included |
$X,XXX |
| SmartNet (various) |
$X,XXX |
DNA Support |
$X,XXX/yr |
$X,XXX |
| Total 5-Year Legacy |
$X,XXX |
|
$X,XXX |
$X,XXX |
6.4 Total Cost of Ownership (TCO)
6.4.1 Current State Costs (5-Year)
+------------------------------------------------------------------+
| CURRENT STATE TCO (5-YEAR) |
+------------------------------------------------------------------+
CATEGORY YEAR 1 YEAR 2-5 5-YR TOTAL
------------------------------------------------------------------
Hardware Maintenance (SmartNet) $X,XXX $X,XXX $X,XXXSoftware Licenses (annual) $X,XXX $X,XXX $X,XXXPrime Infrastructure $X,XXX $X,XXX $X,XXXOperational Labor (FTE: 6) $X,XXX $X,XXX $X,XXXPower & Cooling $X,XXX $X,XXX $X,XXXSecurity Tools (standalone) $X,XXX $X,XXX $X,XXXTraining (annual) $X,XXX $X,XXX $X,XXXIncident Resolution (avg) $X,XXX $X,XXX $X,XXX------------------------------------------------------------------
TOTAL CURRENT STATE $X,XXX==================================================================
6.4.2 Target State Costs (5-Year)
+------------------------------------------------------------------+
| TARGET STATE TCO (5-YEAR) |
+------------------------------------------------------------------+
CATEGORY YEAR 1 YEAR 2-5 5-YR TOTAL
------------------------------------------------------------------
CAPITAL EXPENDITURE (ONE-TIME)
------------------------------------------------------------------
Hardware - Switches - $X,XXXHardware - Wireless (WLC + APs) - $X,XXXHardware - DNAC Appliances - $X,XXXHardware - ISE Appliances - $X,XXXImplementation Services - $X,XXXTraining (initial) - $X,XXX------------------------------------------------------------------
CAPEX SUBTOTAL $X,XXX------------------------------------------------------------------
OPERATING EXPENDITURE (ANNUAL)
------------------------------------------------------------------
DNA Licenses (amortized) $X,XXX $X,XXX $X,XXXISE Licenses (amortized) $X,XXX $X,XXX $X,XXXSupport Contracts $X,XXX $X,XXX $X,XXXOperational Labor (FTE: 4) $X,XXX $X,XXX $X,XXXPower & Cooling $X,XXX $X,XXX $X,XXXCloud Services (if applicable) $X,XXX $X,XXX $X,XXXTraining (ongoing) $X,XXX $X,XXX $X,XXXIncident Resolution (reduced) $X,XXX $X,XXX $X,XXX------------------------------------------------------------------
OPEX SUBTOTAL (5-YEAR) $X,XXX------------------------------------------------------------------
TOTAL TARGET STATE (5-YEAR) $X,XXX==================================================================
6.4.3 TCO Comparison Summary
+------------------------------------------------------------------+
| TCO COMPARISON (5-YEAR) |
+------------------------------------------------------------------+
CURRENT TARGET DELTA
------------------------------------------------------------------
Hardware (CapEx) $X,XXX $X,XXX +$X,XXXImplementation $X,XXX $X,XXX +$X,XXXLicenses $X,XXX $X,XXX +$X,XXXSupport/Maintenance $X,XXX $X,XXX -$X,XXXOperations (Labor) $X,XXX $X,XXX -$X,XXXPower & Cooling $X,XXX $X,XXX +$X,XXXSecurity Tools $X,XXX $X,XXX -$X,XXXTraining $X,XXX $X,XXX +$X,XXXIncidents $X,XXX $X,XXX -$X,XXXCloud Services $X,XXX $X,XXX +$X,XXX------------------------------------------------------------------
5-YEAR TOTAL $X,XXX $X,XXX +$X,XXX------------------------------------------------------------------
YEAR-OVER-YEAR COMPARISON:
Year 1: +$X,XXX(CapEx heavy)
Year 2: -$X,XXXYear 3: -$X,XXXYear 4: -$X,XXXYear 5: -$X,XXX------------------------------------------------------------------
NET 5-YEAR: +$X,XXX(higher initial investment)
==================================================================
6.4.4 Extended TCO (10-Year Projection)
+------------------------------------------------------------------+
| EXTENDED TCO (10-YEAR) |
+------------------------------------------------------------------+
CURRENT STATE (10-Year):
Years 1-5: $X,XXX Years 6-10: $X,XXX(no hardware refresh factored)
Potential hardware refresh (Year 6-7): +$X,XXX TOTAL: $X,XXX
TARGET STATE (10-Year):
Years 1-5: $X,XXX Years 6-10: $X,XXX(OpEx only, CapEx complete)
License renewal (Year 6): +$X,XXX TOTAL: $X,XXX
10-YEAR NET DIFFERENCE: +$X,XXX(2.5% higher)
BREAK-EVEN ANALYSIS:
- Initial investment recovery: Year 7.3
- Considering productivity gains: Year 4.8
- Considering risk reduction: Year 3.9
==================================================================
6.5 ROI Analysis
6.5.1 Quantifiable Benefits
| Benefit Category |
Annual Value |
5-Year Value |
Calculation Basis |
| Operational Efficiency |
|
|
|
| Reduced FTE (2 positions) |
$X,XXX |
$X,XXX |
2 × $X,XXX fully loaded |
| Automation savings |
$X,XXX |
$X,XXX |
1,500 hours × $X,XXX/hr |
| Faster troubleshooting |
$X,XXX |
$X,XXX |
50% MTTR reduction |
| Security Improvements |
|
|
|
| Breach prevention |
$X,XXX |
$X,XXX |
Industry breach cost avg |
| Compliance automation |
$X,XXX |
$X,XXX |
Audit preparation savings |
| Reduced security tools |
$X,XXX |
$X,XXX |
Consolidated tooling |
| Business Enablement |
|
|
|
| Faster onboarding |
$X,XXX |
$X,XXX |
75% reduction × volume |
| Reduced downtime |
$X,XXX |
$X,XXX |
99.99% vs 99.9% SLA |
| Total Annual Benefits |
$X,XXX |
$X,XXX |
|
6.5.2 ROI Calculation
+------------------------------------------------------------------+
| ROI CALCULATION |
+------------------------------------------------------------------+
INVESTMENT (Total CapEx + Year 1 OpEx):
Hardware: $X,XXX Implementation: $X,XXX Year 1 Licenses: $X,XXX Year 1 Operations: $X,XXX ------------------------------------------
TOTAL INVESTMENT: $X,XXX
ANNUAL NET BENEFIT (Year 2 onwards):
Quantified Benefits: $X,XXX Legacy Cost Avoidance: $X,XXX ------------------------------------------
NET ANNUAL BENEFIT: $X,XXX
ROI FORMULA:
ROI = (Net Benefits - Investment) / Investment × 100
5-Year ROI:
Net Benefits (Years 2-5): $X,XXX Total Investment: $X,XXX ------------------------------------------
5-Year ROI: -0.3%
7-Year ROI:
Net Benefits (Years 2-7): $X,XXX Total Investment: $X,XXX ------------------------------------------
7-Year ROI: +49.5%
10-Year ROI:
Net Benefits (Years 2-10): $X,XXX Total Investment: $X,XXX ------------------------------------------
10-Year ROI: +124.3%
==================================================================
6.5.3 Payback Period Analysis
+------------------------------------------------------------------+
| PAYBACK PERIOD ANALYSIS |
+------------------------------------------------------------------+
CUMULATIVE CASH FLOW:
Investment Benefits Cumulative
------------------------------------------------------------------
Year 0 (Implementation) -$X,XXX $X,XXX -$X,XXXYear 1 (First year ops) -$X,XXX $X,XXX -$X,XXXYear 2 $X,XXX $X,XXX -$X,XXXYear 3 $X,XXX $X,XXX -$X,XXXYear 4 $X,XXX $X,XXX -$X,XXXYear 5 $X,XXX $X,XXX +$X,XXXYear 6 (License renewal) -$X,XXX $X,XXX -$X,XXXYear 7 $X,XXX $X,XXX +$X,XXX------------------------------------------------------------------
PAYBACK PERIOD: 4.7 years (simple payback)
DISCOUNTED PAYBACK (8% rate): 5.8 years
==================================================================
6.5.4 Non-Quantifiable Benefits
| Benefit |
Impact |
Strategic Value |
| Zero Trust architecture |
Improved security posture |
Critical for compliance |
| Micro-segmentation |
Reduced lateral movement |
Industry best practice |
| Intent-based networking |
Simplified operations |
Future-proof architecture |
| AI/ML-driven assurance |
Proactive issue detection |
Reduced business impact |
| Consistent policy |
Unified security model |
Reduced complexity |
| Automated compliance |
Continuous validation |
Audit readiness |
| Scalability |
Support for growth |
Business enablement |
| Agility |
Faster changes |
Competitive advantage |
6.5.5 WAN Cost Savings (SD-WAN Migration)
Note: The SD-WAN migration runs in parallel with SD-Access. WAN savings are realized from replacing expensive MPLS circuits with Internet + 5G/LTE at branch sites.
Current WAN Costs (Monthly)
| Site Type |
Sites |
Circuit Type |
Avg Cost/Site |
Total Monthly |
| Hub Sites |
6 |
MPLS 500M-1G |
$X,XXX |
$X,XXX |
| Hub Sites (backup) |
6 |
Internet 500M |
$X,XXX |
$X,XXX |
| Large Branches |
3 |
MPLS 150-200M |
$X,XXX |
$X,XXX |
| Medium Branches |
10 |
MPLS 100M |
$X,XXX |
$X,XXX |
| Small Branches |
20 |
MPLS 50M |
$X,XXX |
$X,XXX |
| EMEA Branches |
12 |
MPLS 50-200M |
$X,XXX |
$X,XXX |
| Total Current WAN |
|
|
|
$X,XXX/month |
Target WAN Costs (Monthly) - Post SD-WAN Migration
| Site Type |
Sites |
Primary |
Secondary |
Avg Cost/Site |
Total Monthly |
| Hub Sites |
6 |
MPLS 500M-1G |
Internet 500M |
$X,XXX |
$X,XXX |
| Large Branches |
3 |
Internet 200M |
5G 100M |
$X,XXX |
$X,XXX |
| Medium Branches |
10 |
Internet 100M |
LTE 50M |
$X,XXX |
$X,XXX |
| Small Branches |
20 |
Internet 50M |
LTE 30M |
$X,XXX |
$X,XXX |
| EMEA Branches |
12 |
Internet 50-100M |
LTE 30M |
$X,XXX |
$X,XXX |
| Total Target WAN |
|
|
|
|
$X,XXX/month |
WAN Cost Savings Summary
+------------------------------------------------------------------+
| WAN COST SAVINGS ANALYSIS |
+------------------------------------------------------------------+
MONTHLY SAVINGS:
Current WAN spend: $X,XXX Target WAN spend: $X,XXX ----------------------------------------
MONTHLY SAVINGS: $X,XXX
ANNUAL SAVINGS: $X,XXX
5-YEAR WAN SAVINGS: $X,XXX
MPLS CIRCUIT TERMINATION COSTS (One-Time):
Early termination fees: $X,XXX (Contracts ending Dec 2026, minimal ETF)
NET 5-YEAR WAN SAVINGS: $X,XXX==================================================================
WAN Savings Impact on ROI
| Metric |
Without WAN Savings |
With WAN Savings |
| Annual Net Benefit |
$X,XXX |
$X,XXX |
| 5-Year Payback |
4.7 years |
2.8 years |
| 5-Year ROI |
-0.3% |
+113% |
| 10-Year ROI |
+124% |
+340% |
Note: WAN savings are contingent on successful SD-WAN migration running in parallel with SD-Access deployment. SD-WAN investment costs are covered in the separate SD-WAN project documentation.
6.6 Budget Planning
6.6.1 Capital Expenditure (CapEx) Breakdown
+------------------------------------------------------------------+
| CAPEX BREAKDOWN BY CATEGORY |
+------------------------------------------------------------------+
HARDWARE - SWITCHING $X,XXX+----------------------------------------------------------------+
| Category | Model | Qty | Unit | Total|
|----------------------|----------------|------|----------|------|
| Border Nodes | C9500-48Y4C | 12 | $X,XXX | $X,XXX|
| Control Plane | C9500-24Y4C | 12 | $X,XXX | $X,XXX|
| Edge (Hub) | C9300-48U | 238 | $X,XXX | $X,XXX|
| Edge (Branch) | C9300-24U | 48 | $X,XXX | $X,XXX|
| Extended Nodes | C9200-48P | 120 | $X,XXX | $X,XXX|
| Optics/Cables | Various | - | - | $X,XXX|
+----------------------------------------------------------------+
HARDWARE - WIRELESS $X,XXX+----------------------------------------------------------------+
| Category | Model | Qty | Unit | Total|
|----------------------|----------------|------|----------|------|
| WLC (Large Sites) | C9800-80 | 6 | $X,XXX | $X,XXX|
| WLC (Medium Sites) | C9800-40 | 6 | $X,XXX | $X,XXX|
| APs (High Density) | C9130AXI | 350 | $X,XXX | $X,XXX|
| APs (Standard) | C9120AXI | 240 | $X,XXX | $X,XXX|
| AP Mounts/Cables | Various | - | - | $X,XXX |
+----------------------------------------------------------------+
HARDWARE - MANAGEMENT $X,XXX+----------------------------------------------------------------+
| Category | Model | Qty | Unit | Total|
|----------------------|----------------|------|----------|------|
| DNAC (Primary) | DN2-HW-APL-XL | 3 | $X,XXX | $X,XXX|
| DNAC (DR) | DN2-HW-APL-XL | 3 | $X,XXX | $X,XXX|
| ISE PAN | SNS-3695-K9 | 2 | $X,XXX | $X,XXX |
| ISE PSN | SNS-3655-K9 | 12 | $X,XXX | $X,XXX |
+----------------------------------------------------------------+
IMPLEMENTATION SERVICES $X,XXX+----------------------------------------------------------------+
| Service | Duration | Rate | Total |
|----------------------|----------------|-----------|------------|
| Cisco Professional | 800 hours | $X,XXX/hr | $X,XXX |
| Integration Partner | 500 hours | $X,XXX/hr | $X,XXX |
| Internal PM | 10 months | $X,XXX/mo| $X,XXX |
| Travel & Logistics | - | - | $X,XXX |
+----------------------------------------------------------------+
TRAINING $X,XXX+----------------------------------------------------------------+
| Course | Attendees | Cost/Person | Total |
|----------------------|-----------|--------------|-------------|
| DNAC Administrator | 6 | $X,XXX | $X,XXX |
| ISE Administrator | 4 | $X,XXX | $X,XXX |
| SD-Access Design | 4 | $X,XXX | $X,XXX |
| Cisco DESDG | 4 | $X,XXX | $X,XXX |
+----------------------------------------------------------------+
TOTAL CAPEX: $X,XXX==================================================================
6.6.2 Operating Expenditure (OpEx) - Annual
+------------------------------------------------------------------+
| ANNUAL OPEX BREAKDOWN |
+------------------------------------------------------------------+
LICENSES (Amortized Annual) $X,XXX+----------------------------------------------------------------+
| License Type | 5-Year Total | Annual |
|----------------------|---------------|------------|
| DNA Advantage (Switch)| $X,XXX | $X,XXX |
| DNA Advantage (Wireless)| $X,XXX | $X,XXX |
| ISE Base + Plus | $X,XXX | $X,XXX |
| DNA Center License | Included | $X,XXX |
+----------------------------------------------------------------+
SUPPORT CONTRACTS $X,XXX+----------------------------------------------------------------+
| Contract Type | Coverage | Annual Cost|
|----------------------|---------------|------------|
| DNA Support (Solution)| 8×5×NBD | $X,XXX |
| ISE Support | 24×7×4hr | $X,XXX |
| DNAC Appliance | 24×7×4hr | $X,XXX |
+----------------------------------------------------------------+
OPERATIONAL LABOR $X,XXX+----------------------------------------------------------------+
| Role | FTE Count | Loaded Cost | Total |
|----------------------|-----------|--------------|------------|
| Network Engineer | 2.5 | $X,XXX | $X,XXX |
| Security Analyst | 1.0 | $X,XXX | $X,XXX |
| NOC Allocation | 0.25 | $X,XXX | $X,XXX |
+----------------------------------------------------------------+
CLOUD SERVICES $X,XXX+----------------------------------------------------------------+
| Service | Type | Annual Cost|
|----------------------|---------------|------------|
| Cisco Cloud (optional)| ThousandEyes | $X,XXX |
+----------------------------------------------------------------+
TRAINING (Ongoing) $X,XXX+----------------------------------------------------------------+
| Type | Frequency | Annual Cost|
|----------------------|---------------|------------|
| Skills refresh | Annual | $X,XXX |
| Certification | Ongoing | $X,XXX |
+----------------------------------------------------------------+
MISCELLANEOUS $X,XXX+----------------------------------------------------------------+
| Item | Description | Annual Cost|
|----------------------|---------------|------------|
| Power & Cooling delta | Incremental | $X,XXX |
| Incident resolution | Reduced | $X,XXX |
+----------------------------------------------------------------+
TOTAL ANNUAL OPEX: $X,XXX==================================================================
6.6.3 Budget by Fiscal Year
| Fiscal Year |
CapEx |
OpEx |
Total |
Cumulative |
| FY1 Q1-Q2 |
$X,XXX |
$X,XXX |
$X,XXX |
$X,XXX |
| FY1 Q3-Q4 |
$X,XXX |
$X,XXX |
$X,XXX |
$X,XXX |
| FY2 |
$X,XXX |
$X,XXX |
$X,XXX |
$X,XXX |
| FY3 |
$X,XXX |
$X,XXX |
$X,XXX |
$X,XXX |
| FY4 |
$X,XXX |
$X,XXX |
$X,XXX |
$X,XXX |
| FY5 |
$X,XXX |
$X,XXX |
$X,XXX |
$X,XXX |
6.6.4 Budget Approval Thresholds
| Amount |
Approval Level |
Documentation Required |
| <$X,XXX |
IT Director |
Quote, business justification |
| $X,XXX- $X,XXX |
VP of IT |
Business case, TCO |
| $X,XXX- $X,XXX |
CIO |
Full business case, ROI |
| >$X,XXX |
CFO + Board |
Executive summary, multi-year plan |
6.7 Vendor Comparison
6.7.1 Alternative Solutions Evaluated
| Vendor |
Solution |
Evaluation Status |
| Cisco |
DNA Center + ISE + SD-Access |
SELECTED |
| Aruba |
ClearPass + Central + CX Fabric |
Evaluated |
| Juniper |
Mist + NAC + Campus Fabric |
Evaluated |
| Extreme |
ExtremeCloud + Control + Fabric |
Not evaluated |
6.7.2 Comparison Matrix
| Criteria |
Weight |
Cisco |
Aruba |
Juniper |
| SD-Access Maturity |
20% |
9/10 |
7/10 |
6/10 |
| Policy Engine |
15% |
9/10 |
8/10 |
7/10 |
| Automation Capability |
15% |
9/10 |
8/10 |
8/10 |
| AI/ML Analytics |
10% |
8/10 |
9/10 |
9/10 |
| Integration (existing) |
15% |
10/10 |
6/10 |
5/10 |
| TCO (5-year) |
15% |
7/10 |
8/10 |
8/10 |
| Vendor Support |
10% |
8/10 |
7/10 |
7/10 |
| Weighted Score |
100% |
8.5 |
7.5 |
7.0 |
6.7.3 Selection Rationale
Cisco DNA Center + ISE Selected Because:
- Existing Investment: Leverages current Cisco infrastructure (60% of devices)
- SD-Access Maturity: Most mature fabric solution in market
- ISE Leadership: Industry-leading policy engine, TrustSec/SGT support
- Integration: Native integration with existing WAN, firewalls
- Skill Availability: Existing team has Cisco certifications
- CVD Documentation: Comprehensive validated designs available
- TAC Support: Global support organization with SD-Access expertise
Trade-offs Accepted:
- Higher licensing cost vs. alternatives
- Proprietary technology lock-in
- Complex initial deployment
6.8 Risk-Adjusted Projections
6.8.1 Sensitivity Analysis
+------------------------------------------------------------------+
| SENSITIVITY ANALYSIS |
+------------------------------------------------------------------+
BASE CASE ASSUMPTIONS:
- Implementation timeline: 40 weeks
- Benefit realization: 100% by Year 2
- No scope changes
- No additional hardware required
SCENARIO ANALYSIS:
Pessimistic Base Case Optimistic
------------------------------------------------------------------
Timeline Extension +25% (50 wks) 40 weeks -10% (36 wks)
Benefit Realization 75% 100% 110%
Hardware Contingency +15% 0% -5%
Labor Cost Variance +20% 0% -10%
5-YEAR NPV IMPACT:
Pessimistic Base Case Optimistic
------------------------------------------------------------------
Timeline Only -$X,XXX $X,XXX +$X,XXXenefits Only -$X,XXX $X,XXX +$X,XXXHardware Only -$X,XXX $X,XXX +$X,XXXLabor Only -$X,XXX $X,XXX +$X,XXXCombined -$X,XXX $X,XXX +$X,XXX
RISK-ADJUSTED NPV RANGE:
Best Case: +$X,XXXExpected (Base): $X,XXXWorst Case: -$X,XXX==================================================================
6.8.2 Risk Contingency Budget
| Risk Category |
Probability |
Impact |
Contingency |
| Schedule delay |
30% |
$X,XXX |
$X,XXX |
| Hardware issues |
20% |
$X,XXX |
$X,XXX |
| Integration complexity |
25% |
$X,XXX |
$X,XXX |
| Resource availability |
15% |
$X,XXX |
$X,XXX |
| Scope creep |
20% |
$X,XXX |
$X,XXX |
| Total Contingency |
|
|
$X,XXX |
Recommended Contingency Reserve: $X,XXX(7.5% of CapEx)
6.9 Business Case Summary
6.9.1 Executive Summary
+------------------------------------------------------------------+
| EXECUTIVE BUSINESS CASE |
+------------------------------------------------------------------+
PROJECT: Traditional Network to SD-Access Migration
STRATEGIC ALIGNMENT:
✓ Zero Trust security transformation
✓ Digital workplace enablement
✓ Operational efficiency improvement
✓ Compliance automation
INVESTMENT SUMMARY:
Total CapEx: $X,XXX Annual OpEx: $X,XXX 5-Year TCO: $X,XXX
FINANCIAL METRICS:
5-Year ROI: -0.3% (investment phase)
7-Year ROI: +49.5%
10-Year ROI: +124.3%
Payback Period: 4.7 years
RISK ASSESSMENT:
Overall Risk Level: MEDIUM
Risk Mitigation: $X,XXXcontingency
RECOMMENDATION:
PROCEED with phased implementation
APPROVAL REQUIRED:
CIO + CFO approval for CapEx > $X,XXX
KEY SUCCESS FACTORS:
1. Executive sponsorship
2. Skilled implementation team
3. Change management program
4. Phased rollout with validation gates
==================================================================
6.9.2 Investment Justification
| Factor |
Justification |
| Strategic |
Enables Zero Trust architecture required by board security mandate |
| Operational |
Reduces network operations headcount by 2 FTE through automation |
| Security |
Micro-segmentation reduces breach impact by 80% (industry data) |
| Compliance |
Automated compliance reporting saves 200+ hours annually |
| Agility |
New site deployment reduced from 4 weeks to 4 days |
| Risk |
End of life hardware (Cat 6500) creates operational risk |
6.9.3 Approval Signatures
+------------------------------------------------------------------+
| BUSINESS CASE APPROVAL |
+------------------------------------------------------------------+
Project: SD-Access Migration
Total Investment: $X,XXX(CapEx) + $X,XXX(5-yr OpEx)
APPROVALS:
IT Director: _________________________ Date: __________
[Print Name]
VP of IT: _________________________ Date: __________
[Print Name]
CIO: _________________________ Date: __________
[Print Name]
CFO: _________________________ Date: __________
[Print Name]
COMMENTS:
______________________________________________________________
______________________________________________________________
______________________________________________________________
+------------------------------------------------------------------+
Summary
Chapter 6 provides comprehensive financial analysis for the SD-Access migration:
- Migration Strategy: 40-week phased hybrid approach with defined sequence
- Legacy Decommissioning: Hardware retirement schedule and license termination
- License Mapping: DNA Advantage licensing model with 5-year costs
- TCO Analysis: 5-year comparison showing $X,XXX higher investment
- ROI Analysis: 4.7-year payback, 124% ROI over 10 years
- Budget Planning: Detailed CapEx/OpEx breakdown by category
- Vendor Comparison: Cisco selected with 8.5/10 weighted score
- Risk Analysis: $X,XXX contingency recommended
- Business Case: Executive summary for approval
Key Financial Metrics:
- Total 5-Year Investment: $X,XXX
- Annual Operational Savings: $X,XXX (from Year 2)
- Payback Period: 4.7 years
- 10-Year ROI: 124%
Next Chapter: Chapter 7 covers Advanced Features and AI/ML capabilities.