1. Executive Sizing Summary

1.1 Global Infrastructure Overview

Component Quantity Model Purpose
Catalyst Center Cluster 6 nodes DN2-HW-APL-XL 3 Primary + 3 DR
ISE PAN/MnT 4 nodes SNS-3755-K9 2 Primary + 2 Secondary
ISE PSN 12 nodes SNS-3715-K9 Distributed authentication
Fabric Sites 9 sites - Global coverage
Total Endpoints ~25,000 - Wired + Wireless
Total Access Points 940 Wi-Fi 6/6E/7 Campus wireless

2. Site-by-Site Hardware Sizing

2.1 Campus Sites (Full Fabric)

Site Users Endpoints Border Control Plane Edge WLC APs ISE PSN
Mumbai 2,500 5,000 2 × C9500-48Y4C 2 × C9500-24Y4C 48 × C9300 2 × C9800-40 200 2 × SNS-3715
Chennai 1,800 3,600 2 × C9500-48Y4C 2 × C9500-24Y4C 36 × C9300 2 × C9800-40 120 2 × SNS-3715
London 2,000 4,000 2 × C9500-48Y4C 2 × C9500-24Y4C 42 × C9300 2 × C9800-40 160 2 × SNS-3715
Frankfurt 1,400 2,800 2 × C9500-48Y4C 2 × C9500-24Y4C 28 × C9300 2 × C9800-40 100 2 × SNS-3715
New Jersey 2,600 5,200 2 × C9500-48Y4C 2 × C9500-24Y4C 52 × C9300 2 × C9800-80 240 2 × SNS-3715
Dallas 1,600 3,200 2 × C9500-48Y4C 2 × C9500-24Y4C 32 × C9300 2 × C9800-40 120 2 × SNS-3715

2.2 Branch Sites (Fabric-in-a-Box)

Site Users Endpoints FiaB Stack Edge WLC APs ISE Access
Bangalore 500 1,000 2 × C9300-48UXM 8 × C9300 EWC 50 Mumbai PSN
Delhi 400 800 2 × C9300-48UXM 6 × C9300 EWC 40 Mumbai PSN
Noida 200 400 2 × C9300-48UXM 4 × C9300 EWC 20 Mumbai PSN

3. Capacity Calculations

3.1 Endpoint Calculation Methodology

Endpoint Calculation per Site:
├── Corporate Endpoints
│   ├── Desktops/Laptops: Users × 1.2 (some users have multiple)
│   ├── IP Phones: Users × 0.8 (not all have desk phones)
│   ├── Mobile Devices (BYOD): Users × 0.5
│   └── Printers/Shared: Users × 0.05
├── IoT Devices
│   ├── Sensors: Based on building size
│   ├── Cameras: Based on security requirements
│   └── Building Management: Based on facilities
└── Guest Devices
    └── Estimated: Users × 0.1 (daily visitors)

Example - Mumbai (2,500 users):
  Desktops/Laptops:    2,500 × 1.2  = 3,000
  IP Phones:           2,500 × 0.8  = 2,000 (included in 5,000)
  BYOD Devices:        2,500 × 0.5  = 1,250
  Printers/Shared:     2,500 × 0.05 =   125
  IoT Devices:                      =   400
  Guest (daily):       2,500 × 0.1  =   250
  ─────────────────────────────────────────
  Total Endpoints:                  ≈ 5,000 (with overlap)

3.2 Access Point Calculation

AP Calculation Methodology:
├── High-Density Areas (Conference, Cafeteria)
│   └── 1 AP per 30 users
├── Standard Office Areas
│   └── 1 AP per 40 users (open plan)
│   └── 1 AP per 25 users (private offices)
├── Coverage-based Areas (Corridors, Lobby)
│   └── 1 AP per 2,500 sq ft
└── Outdoor Areas
    └── 1 AP per 5,000 sq ft

Example - Mumbai Campus:
  Building A (1,000 users): 30 APs
  Building B (800 users):   25 APs
  Building C (500 users):   15 APs
  Data Center area:         10 APs
  Common areas/outdoor:     20 APs
  Conference rooms (30):    30 APs (1 per room)
  Executive floor:          10 APs
  Cafeteria/Gym:            10 APs
  Lobby/Reception:           5 APs
  Parking/Outdoor:           5 APs
  Redundancy (20%):         40 APs
  ─────────────────────────────────
  Total APs:               200 APs

3.3 Edge Switch Calculation

Edge Switch Sizing:
├── Port Requirements
│   ├── User ports: Endpoints × 1.1 (10% spare)
│   ├── AP ports: APs × 1.0
│   ├── Uplink ports: Based on bandwidth
│   └── Management ports: 2-4 per IDF
├── Switch Selection
│   ├── C9300-48U: Standard access (48 ports)
│   ├── C9300-24U: Small IDF (24 ports)
│   └── C9300-48UXM: mGig for APs (48 ports)
└── Stack Sizing
    └── Max 8 switches per stack

Example - Mumbai:
  Total ports needed: 5,000 × 1.1 = 5,500 ports
  AP ports (mGig):    200 ports

  Standard switches: 5,500 / 48 = 115 switches
  mGig switches:     200 / 48   =   5 switches

  With stacking efficiency: ~48 switches total
  (Multiple stacks across IDFs)

4. Catalyst Center Sizing

4.1 Cluster Requirements

Deployment Size Devices Cluster Type Nodes Specifications
Small < 1,000 Single Node 1 DN2-HW-APL
Medium 1,000 - 5,000 3-Node Cluster 3 DN2-HW-APL-L
Large 5,000 - 10,000 3-Node Cluster 3 DN2-HW-APL-XL
Enterprise > 10,000 3-Node + DR 6 DN2-HW-APL-XL

4.2 Abhavtech Catalyst Center Sizing

Catalyst_Center_Sizing:

  Total_Managed_Devices:
    Switches: 350+
    Wireless_Controllers: 14
    Access_Points: 940
    Routers: 25
    Total: ~1,350 devices

  Recommendation: 3-Node Cluster + 3-Node DR

  Primary_Cluster:
    Location: New Jersey Data Center
    Nodes: 3 × DN2-HW-APL-XL
    Specs_per_Node:
      vCPU: 56 cores
      RAM: 256 GB
      Storage: 2.4 TB SSD (RAID)
      Network: 2 × 10G + 1 × 1G CIMC

  DR_Cluster:
    Location: London Data Center
    Nodes: 3 × DN2-HW-APL-XL
    Replication: Warm standby
    RPO: 4 hours
    RTO: 2 hours

4.3 Catalyst Center Capacity Limits

Resource DN2-HW-APL-XL Limit Abhavtech Usage Utilization
Network Devices 10,000 1,350 13.5%
Access Points 18,000 940 5.2%
Endpoints 200,000 25,000 12.5%
Concurrent API Sessions 100 20 20%
Sites 500 9 1.8%

5. ISE Sizing

5.1 ISE Node Requirements

ISE_Sizing_Calculation:

  Total_Endpoints: 25,000
  Concurrent_Sessions: ~18,000 (70% at any time)
  Peak_Auth_Rate: 500 authentications/second

  PSN_Sizing:
    Model: SNS-3715-K9
    Capacity_per_PSN: 50,000 concurrent sessions
    Recommended_Load: 60% = 30,000 sessions

    Required_PSNs: 18,000 / 30,000 = 1 (minimum)
    With_Redundancy: 2 per region × 6 regions = 12 PSNs

  PAN_Sizing:
    Model: SNS-3755-K9
    Primary: New Jersey
    Secondary: London
    Purpose: Policy administration, sync

  MnT_Sizing:
    Model: SNS-3755-K9
    Co-located with PAN
    Storage: 2.4 TB for 90-day retention

5.2 ISE Hardware Specifications

Role Model vCPU RAM Storage Qty
PAN Primary SNS-3755-K9 24 cores 256 GB 2.4 TB 1
PAN Secondary SNS-3755-K9 24 cores 256 GB 2.4 TB 1
MnT Primary SNS-3755-K9 24 cores 256 GB 2.4 TB 1
MnT Secondary SNS-3755-K9 24 cores 256 GB 2.4 TB 1
PSN (×12) SNS-3715-K9 16 cores 96 GB 600 GB 12

5.3 ISE Performance Metrics

Metric SNS-3715 (PSN) SNS-3755 (PAN/MnT)
Max Concurrent Sessions 100,000 N/A
RADIUS Auth/sec 20,000 N/A
TACACS+ Auth/sec 10,000 N/A
Profiled Endpoints 500,000 500,000
pxGrid Subscriptions 100 100

6. WLC Sizing

6.1 Wireless Controller Requirements

WLC_Sizing:

  Model_Selection:
    C9800-40: Up to 2,000 APs, 32,000 clients
    C9800-80: Up to 6,000 APs, 64,000 clients
    C9800-CL: Virtual, up to 6,000 APs
    EWC: Embedded, up to 200 APs

  Site_Assignments:
    Mumbai:
      APs: 200
      Clients: ~4,000 concurrent
      Model: 2 × C9800-40 (HA SSO)

    New_Jersey:
      APs: 240
      Clients: ~5,000 concurrent
      Model: 2 × C9800-80 (HA SSO)

    Branch_Sites:
      APs: 20-50 per site
      Model: EWC on C9300

6.2 WLC Hardware Summary

Site Model APs Supported Client Capacity HA Mode
Mumbai 2 × C9800-40 200 8,000 SSO
Chennai 2 × C9800-40 120 4,800 SSO
London 2 × C9800-40 160 6,400 SSO
Frankfurt 2 × C9800-40 100 4,000 SSO
New Jersey 2 × C9800-80 240 9,600 SSO
Dallas 2 × C9800-40 120 4,800 SSO
Bangalore EWC 50 1,000 N+1
Delhi EWC 40 800 N+1
Noida EWC 20 400 N+1

7. IP Address Sizing

7.1 IP Pool Requirements per Site

IP_Pool_Sizing_Mumbai:

  VN_CORPORATE:
    Users: 2,500
    Devices_per_user: 2.5
    Total_IPs_needed: 6,250
    Pool_size: /20 (4,096) + /21 (2,048) = 6,144
    Pools:
      - 10.100.0.0/20 (Data)
      - 10.100.16.0/21 (Overflow)

  VN_VOICE:
    IP_Phones: 2,000
    Pool_size: /21 (2,048)
    Pool: 10.100.32.0/21

  VN_IOT:
    Devices: 400
    Pool_size: /23 (512)
    Pool: 10.100.40.0/23

  VN_GUEST:
    Daily_visitors: 250
    Pool_size: /24 (256)
    Pool: 10.100.50.0/24

  INFRA_VN:
    APs: 200
    Management: 50
    Pool_size: /23 (512)
    Pool: 10.100.60.0/23

7.2 Global IP Allocation Summary

Site VN_CORPORATE VN_VOICE VN_IOT VN_GUEST INFRA_VN Total IPs
Mumbai /20 + /21 /21 /23 /24 /23 9,216
Chennai /20 /22 /24 /24 /24 5,120
London /20 /21 /23 /24 /23 7,168
Frankfurt /21 /22 /24 /24 /24 3,328
New Jersey /19 + /21 /21 /23 /24 /23 11,264
Dallas /20 /22 /24 /24 /24 5,120
Branches /22 each /24 /25 /25 /25 1,536

8. Licensing Requirements

8.1 Cisco DNA Licensing

DNA_Licensing:

  License_Tier: DNA Advantage (Required for SD-Access)

  Term: 5-year subscription

  Device_Counts:
    Switches: 350
    Wireless_Controllers: 14
    Access_Points: 940

  License_SKUs:
    - C9300-DNA-A-48-5Y × 300 (48-port switches)
    - C9300-DNA-A-24-5Y × 50 (24-port switches)
    - C9500-DNA-A-5Y × 20 (border/CP nodes)
    - AIR-DNA-A-5Y × 940 (access points)
    - DNA-C-T1-A-5Y × 6 (Catalyst Center appliances)

8.2 ISE Licensing

ISE_Licensing:

  License_Model: ISE Advantage (Required for TrustSec)

  Base_License:
    Type: ISE Base
    Quantity: 25,000 endpoints

  Plus_License:
    Type: ISE Plus (Profiling, pxGrid)
    Quantity: 25,000 endpoints

  Apex_License:
    Type: ISE Apex (Posture, BYOD)
    Quantity: 10,000 endpoints (mobile/BYOD)

  Device_Admin_License:
    Type: TACACS+
    Quantity: 400 network devices

8.3 License Summary

License Type Quantity Term Purpose
DNA Advantage - Switches 350 5-year SD-Access fabric
DNA Advantage - APs 940 5-year Wireless assurance
DNA Advantage - WLC 14 5-year Controller management
ISE Base 25,000 Perpetual Authentication
ISE Plus 25,000 Perpetual Profiling, pxGrid
ISE Apex 10,000 Perpetual Posture, BYOD
ISE Device Admin 400 Perpetual TACACS+
ThousandEyes 47 agents Subscription Network visibility

9. Growth Planning

9.1 5-Year Growth Projections

Year Users Endpoints APs Sites Growth Rate
Year 1 (Current) 12,000 25,000 940 9 Baseline
Year 2 13,200 27,500 1,034 10 10%
Year 3 14,500 30,250 1,137 11 10%
Year 4 16,000 33,275 1,251 12 10%
Year 5 17,600 36,600 1,376 14 10%

9.2 Capacity Headroom Analysis

Component Current Capacity Current Usage Year 5 Projected Headroom
Catalyst Center 200,000 endpoints 25,000 36,600 82%
ISE Sessions 600,000 18,000 26,000 96%
WLC AP Capacity 2,400 940 1,376 43%
IP Address Space /14 allocated /16 used /15 projected 50%

10. Bill of Materials Summary

10.1 Network Hardware

Category Item Quantity Purpose
Border Nodes C9500-48Y4C 12 Fabric border
Control Plane C9500-24Y4C 12 Map server/resolver
Edge Switches C9300-48UXM 200 mGig access
Edge Switches C9300-48U 100 Standard access
Edge Switches C9300-24U 50 Small IDF
FiaB Switches C9300-48UXM 6 Branch fabric
WLC Campus C9800-40 10 Campus wireless
WLC Large C9800-80 2 Large campus
Wi-Fi 7 APs CW9176I 235 Latest technology
Wi-Fi 6E APs C9136I 470 Standard coverage
Wi-Fi 6 APs C9130AXI 235 Legacy/backup

10.2 Management Infrastructure

Category Item Quantity Purpose
Catalyst Center DN2-HW-APL-XL 6 Network management
ISE PAN/MnT SNS-3755-K9 4 Policy admin
ISE PSN SNS-3715-K9 12 Authentication
Infoblox Grid IB-4030 2 DDI master
Infoblox Members IB-2225 12 Regional DDI

11. Validation Checklist

11.1 Pre-Deployment Verification

Sizing_Validation:

  Catalyst_Center:
    - [ ] Cluster size matches device count
    - [ ] Appliance specs meet requirements
    - [ ] DR site provisioned
    - [ ] Network connectivity verified

  ISE:
    - [ ] PSN count covers all regions
    - [ ] Session capacity adequate
    - [ ] Storage for 90-day retention
    - [ ] HA pairs configured

  Switching:
    - [ ] Port count covers endpoints + 20%
    - [ ] mGig ports for all APs
    - [ ] Uplink bandwidth adequate
    - [ ] Stack sizes within limits

  Wireless:
    - [ ] AP count per coverage model
    - [ ] WLC capacity for APs + 30%
    - [ ] Client capacity verified
    - [ ] HA mode configured

  Licensing:
    - [ ] DNA Advantage for all devices
    - [ ] ISE licenses match endpoints
    - [ ] Smart Licensing configured
    - [ ] Term length aligned

Document Version: 2.0 Abhavtech.com - SD-Access Implementation